University Masjid is an extremely important part of Islamic culture and they offer many benefits to the community. They offer a place where Muslims can pray and interact without prejudice, no matter what part of the world they are in. Where education does not exist, mosques offer a place where people both young and old can learn. They also accept money in the name of charity and host fundraisers for these charities so that the community is able to aid and help important organizations that support them.

Construction of University Masjid in Main Campus of University of Science & Technology Bannu for the students and staff in the premises of University is dire need because there is no other Masjid with in the Main Campus of UST Bannu.

General Objectives of the Project: 

  • The purpose of the project is to provide own permanent building of University Masjid in University of Science & Technology Bannu in which the students & staff will perform prayers and worships of Allah in a safe and peaceful environment. 
  • To strengthen and expand the University through own Infrastructure Facilities to provide peaceful and working environment to students and staff. 
  • The project envisages for establishing of own building for  University Masjid of University of Science & Technology Bannu with in the campus.

 JUSTIFICATION

The Main Campus of University of Science and Technology Bannu has been established on 1202 Kanal Land area in Bannu Township Bannu in which some of the buildings like Administration Block, Academic Block, Central Library, Boys Hostel, Staff Hostel, Mini Market are already established while in future more Academic buildings, Students Hostels, Staff house/University Guest House, staff residential colony are planned/in pipeline to be constructed in the next few years. Presently there is no University Masjid facility to the students and staffs. The main campus is located near to tribal belt and the students & staff needs full proof security during performing their prayers. Due to these reason / requirements, the University authorities have proposed to construct a building for University Masjid in the Main Campus of UST Bannu for which the land is already specified with in Main Campus. 

 

SUMMARY OF THE PROJECT COST

S.#.

Items

Local Cost (m. Rs.)

F.E.C.    (m. Rs.)

Total Cost (m. Rs.)

Details  at :

1

Civil Work  

261.064

----

261.064

Annexure - 4.1.1

2

Equipment

3.935

----

3.935

Annexure - 4.1.2

3

Furniture & Fixture

5.850

----

5.850

Annexure - 4.1.3

4

Project Implementation Unit Cost

8.936

----

8.936

Annexure - 4.1.4

 

Sub Total

----

0.000

279.785

----

5

Contingencies @ 2%

----

----

5.596

----

 

Total

 

0.000

285.380

 

 

Summary of Civil Work Cost

S.#

Items

Area (sq.ft)

Unit Rate (Rs/sq.ft.)

Total Cost (m. Rs.)

Details at

1

Construction of Mosque 

53927

4200

226.494

Annexure-4.1.1.(a)

2

External Developmental Works

----

----

22.138

Annexure-4.1.1.(f)

 

Sub-Total

53927

----

248.632

----

3

Consultancy and overall supervision      
(5% of total civil work cost)

----

----

12.432

----

 

Total

 

 

261.064

 

Details of Civil Work

S.No.

Item

Covered Area (sq.ft.)

Qty/ No.

Total covered Area (sq.ft)

1

Prayer Hall (175'-9"x75')

13181.25

2

26362.5

2

Front Corridors 13'-3" wide

1927.88

4

7711.5

3

Central Corridors 16'-9" wide

904.50

2

1809

4

Side corridors 8'-6" wide

459.00

4

1836

5

Side corridors 10'-6" wide

375.38

4

1501.5

6

Stores (14'-4-1/2"x14')

201.25

4

805

7

Ablution Area (42'-6"x12'-3")

520.63

4

2082.5

8

Reading Rooms (14''-1-1/2"x17'-3")

243.66

2

487.3125

9

Library (17'-1-1/2"x17'-3")

295.41

1

295.40625

10

Podium (18'-3"x13'-9")

250.94

1

250.9375

 

Sub Total

 

28

43142

11

Add Circulation Area  25%          (Wall thickness and lavatories)

 

 

10785

 

Total

 

 

53927

 

External Development Works

S. No.

Item

Units

Covered Area (Rft/sft) / No's

 Rate per sft/per Unit Cost (Rs.)

Total Cost (Rs Million)

1

Boundary wall around the Mosque 

Rft

800

2500

2.000

2

Overhead Water - Tank    50000 Gallon Capacity, Height: 60 feet.

Nos

1

7,028,329

7.028

3

Electrification

 

 

 

 

 (a)

Transformer 200 KVA

Nos

1

800,000

0.800

(b)

External Electrification
Detail at Annex - 4.1.1.F (a)

-

-

5,110,000

5.110

4

Partial Horticulture and Landscaping 

Sq-ft

-

500,000

0.500

5

External water supply and Drainage
Detail at Annex - 4.1.1.F (b)

-

-

669,500

0.670

6

Sewerage/Sanitation work
Detail at Annex - 4.1.1.F (c)

-

-

3,530,415

3.530

7

PESCO / WAPDA Charges

 

 

1,000,000

1.000

8

Sui Gas Connection Charges Payable to SNGPL

 

 

1,500,000

1.500

 

Grand Total

-

-

-

22.138

 

Equipment’s

S. No.

Item

Qty.

Unit Cost   
( Rs.)

 Cost (m.Rs.)

1

Stand by 40 KVA Electrical Generator with complete accessories / cables

1

 2,000,000

2.000

2

Loud Speakers / Sound System

1

    500,000

0.500

3

Vacum Cleaners

2

    150,000

0.300

4

Air Coolers / Room Coolers

20

       24,000

0.480

5

Satablizers (10000 - 20000 watts)

5

       20,000

0.100

6

Water Coolers  + Filteration set

10

       36,000

0.360

7

Computer System

2

       70,000

0.140

8

Laser Printers

1

       55,000

0.055

 

 Total

 

 

3.935

  

Furniture & Fixture

S.#.

Item Description

Qty. /Nos.

Unit Rate (Rs.)

Total Cost
(Rs Million)

1

Stage (Member for  Peshimam)

1

10000

0.010

2

Bed with Mattress

10

25000

0.250

3

Restroom

2

2500

0.005

4

Chairs for aged/disable persons

6

5000

0.030

5

Sofa Set

2

25000

0.050

6

Central Table

2

3500

0.007

7

Office Chairs

20

1800

0.036

8

Reading Tables for Library

2

15000

0.030

9

Office Chairs for Library

20

2500

0.050

10

Racks

20

4000

0.080

11

Library Shelves

10

20000

0.200

12

File Cabinet (Steel) Safe

5

10000

0.050

13

Almirah (Steel)

4

10000

0.040

14

Computer Table

1

7000

0.007

15

Computer Chairs (Revolving)

1

5000

0.005

16

Carpets  

-

5000000

5.000

 

Total    

 

5.850

Jamia Msjid-UST Bannu-1 

 Jamia Msjid-UST Bannu-3

 Main Campus Master Plan

 

For Construction of the University Masjid Please Contact to :

Dr. Hussain Muhammad  (Phone: +92928-612644, Fax: +92928-624088)
Dr. Amin Khan (+92-3332537774 )
Mr. Hazrat Amin (+92-3369724759)
Mr. Rahmat Ullah Khan (+92-3339741577)
Mr. Samrad Ullah Khan (+92-3339748746)

 

 The University Masjid needs Donation for its construction, please send the Donation to the online account No. HBL-UST Bannu Main Campus A/C No.0023187000123303 

You are here: Home General Information University Masjid